Hullmark Centre / Sheppard-Yonge TTC Station

Hullmark Centre - Sheppard-Yonge TTC Station

Client
Tridel

Architect
NORR

Project Completion 
August 2015

Description
The project involved the construction of two tunnels between the future mixed-use large development Hullmark Centre and the existing TTC Sheppard-Yonge Station. Two ventilation shafts were also constructed for the TTC Station.

Intricate structural tie-ins were required under Yonge Street to the existing and operational TTC station.for the exhaust shafts while existing exits were tied into for the pedestrian walkways.

The work also included the fit out of the new ticket booth.

.

St. Clair West TTC Station

St. Clair West TTC Station

Client
Toronto Transit Commission

Architect
AECOM/ IBI Group

Project Completion 
December 2017

Description
Added three new elevators in the existing station and two new walkway/ bridges at platform level.

The challenge was to have this large-scale project done in an operating station and not impacting TTC commuters.

.

Coxwell TTC Station

Coxwell TTC Station

Client
Toronto Transit Commission

Architect
AECOM

Project Completion 
June 2018

Description
Added two new elevators in existing facility, new bus loop pavement and lighting. Added new power operated doors and new eye-catching signage.

The largest challenge was the restricted site. Together with the TTC and with the homeowners' cooperation, we were able to complete this project professionally and on time and budget despite all the constraints we faced.

VlA Rail Oshawa Station

VlA Rail Oshawa Station

Client
Via Rail Canada

Architect
AECOM / architects girard cote berube dion

Project Completion 
September 2012

Description
Construction of a new lateral platform and connecting bridge to new 700-foot island platform located between the east and westbound tracks at the Oshawa VIA Rail / GO Station.

Access to the tracks is by stairs and elevators in both the new lateral and island platform buildings (total 11,000 sq. ft.)

All work was completed while both CN and GO maintained all normal rail operations

VIA Rail Belleville Station

VIA Rail Belleville Station

Client
Via Rail Canada

Architect
AECOM / architects girard cote berube dion

Project Completion 
March  2012

Description
Construction of a new train station with connecting bridge to new 700-foot island platform located between the east and westbound tracks.

Access to the tracks is by stairs and elevators in both the new station and island platform buildings (total 13,000 sq. ft.)

All work was completed while CN maintained all normal rail operations

Oshawa Operations Centre

Oshawa Operations Centre

Client
City of Oshawa

Architect
KNY Architects

Project Completion
November 2015

 

Description
The project consisted of renovating an existing office building complete with the warehouse. It also included new wash bays, new lifts for vehicle maintenance and new weigh scale. Part of the project was to construct a new salt storage facility, a canopy for vehicles and a new fuel station as part of the new operations center. New mechanical and electrical upgrades, including a new security system, was completed for the building.

Skyway WWTP Dewatering & Gas Upgrades

jj mcguire industrial

Skyway WWTP Dewatering & Gas Upgrades

Client
The Regional Municipality of Halton

Consultant
KMK Consultants

Project Completion 
July 2011

Description
This project helped increase the functioning capacity of the growing region. It involved extensive gas compressor and dewatering upgrades as well as the supply and installation of new equipment including SBR Tank, centrifuge polymer systems, sludge grinder, and Scada PLC.

All work had to be completed within the operating facility and with little disturbance to the functioning plant. This project also involved extensive start-up and commissioning to ensure equipment was fully functioning prior to switching over from existing systems.

TTC Finch Station Fire Ventilation Upgrades

jj mcguire industrial

TTC Finch Station Fire Ventilation Upgrades

Client
Toronto Transit Commission

Architect
TTC Engineering

Project Completion
September 2010

Description
Finch and York Mills Stations were re-worked with existing vent shafts, including shoring and demolition. The new shaft was constructed with little disruption to the public and owners daily operations.

The rail track work included new structural support steel and removal of the existing structure to allow more air movement and future expansion.

TTC St. Andrews Station Easier Access

jj mcguire subway

TTC St. Andrews Station Easier Access Phase 3

Client
Toronto Transit Commission

Architect
Norr Limited

Project Completion 
April 2012

Description
St. Andrew Station required (2) new elevator shafts and elevators, fare gates, A/C units and new electrical upgrades to make the station wheelchair accessible. With public transportation vastly growing in the downtown core of Toronto, upgrades are constantly required at TTC Subway Stations to accommodate passengers needs.

Ontario Power Generation

jj mcguire industrial

Ontario Power Generation

Client
Ontario Power Generation Inc.

Architect
Various Architects

Consultant
Various Consultants

Project Completion
December 2010

 

Description

J. J. McGuire has completed various projects at OPG Pickering since 2001 working mainly as a civil contractor. OPG has strict security clearance policies and all staff must be granted security clearance to perform any type of work within OPG grounds.

Major projects include:

1) Constructing the 22 m diameter foundation for the new wind turbine in 2001

2) Constructing pre-engineered auxiliary buildings and equipment foundations in 2006

3) Auxiliary power system tie-in project in 2006

4) Various small civil contracts in 2007 & 2008